Motorists across Gedling borough could face a number of delays over the coming days, with road closures, resurfacing, utility works and new crossing works planned.
Here’s our round-up of the roadworks taking place across the borough from Monday, November 24 to Tuesday, December 2.
Monday, November 24
Breck Hill Road, Woodthorpe
Two-way temporary traffic lights will be in place opposite number 5 while Nottinghamshire County Council replaces an 8m lighting column.
When: November 24
Arnold Lane, Gedling
Two-way temporary traffic lights will be used while trial holes are excavated on either side of the carriageway.
When: November 24-27
Holkham Close, Arnold
Give-and-take traffic control will be in operation outside number 34 while a 6m lighting column is replaced.
When: November 24
Norbett Road, Arnold
Give-and-take traffic control will be in operation for Openreach works.
When: November 24-25
Tuesday, November 25
Lingwood Lane, Woodborough
The road will be closed between Main Street and Wood’s Foundation C of E Primary School for carriageway patching repairs. A diversion will operate via Main Street.
When: November 25-26
Church Drive, Arnold
Give-and-take traffic management will be in place while four 6m lighting columns and a signpost are replaced.
When: November 25-27
Main Street, Calverton
Give-and-take traffic control will be used outside number 158 while a sunken gully is reset.
When: November 25-26
Wednesday, November 26
Standhill Road, Carlton
A diversion will be in operation in connection with a Christmas event.
When: November 26
Mayfield Road, Carlton
The road will be closed for a Christmas event.
When: November 26
Duke Street, Arnold
The road will be closed for Openreach works, with a diversion via St Albans Road.
When: November 26
Shaftesbury Avenue, Burton Joyce
The road will be closed from the junction with Gordon Road to the Main Street junction while a VMS sign is installed. Diversions will operate in the area.
When: November 26-27
Shearing Hill, Gedling
Give-and-take traffic control will be in place at the junction with Station Avenue while seven damaged tactile slabs are replaced.
When: November 26-27
Langford Road, Arnold
Give-and-take traffic control will be used while carriageway repairs are carried out at several locations along the road.
When: November 26-27
Walsingham Road, Woodthorpe
Multi-way temporary traffic lights will be in place for Openreach works.
When: November 26-27
Thursday, November 27
Victoria Road, Netherfield
The road will be closed, with a diversion route in operation, for a Christmas event.
When: November 27
Lorimer Avenue, Gedling
Multi-way temporary traffic lights will be in operation for Openreach works.
When: November 27
Oakdale Road, Carlton
Multi-way temporary traffic lights will be in place for Vodafone works.
When: November 27-30
Saturday, November 28
Sandfield Road, Arnold
The road will be closed between Thackeray’s Lane and Aylesham Avenue for the installation of a new Puffin crossing.
When: November 28-30
Thackerays Lane, Woodthorpe
A road closure will be in place around the Thackerays Lane, Arnot Hill Road and Sandfield Road junction as part of the Puffin crossing scheme.
When: November 28-30
Arnot Hill Road, Arnold
The road will also be closed, with a diversion in operation, as part of works in the Sandfield Road/Thackerays Lane area.
When: November 28-30
Sunday, November 29
There are no new Gedling borough schemes in the supplied list beginning on November 29.
Monday, November 30
Coppice Road/Coppice Gate, Arnold
A road closure and temporary parking restrictions will be introduced while Nottinghamshire County Council resurfaces the carriageway and footway. A diversion route will operate.
When: November 30-December 11
Calverton Road, Arnold
Two-way temporary traffic lights will be in place for Open Fibre Networks works.
When: November 30-December 2
Georges Lane, Calverton/Arnold
Two-way temporary traffic lights will be in operation for Open Fibre Networks works.
When: November 30-December 2
Laneham Avenue/Winthorpe Road, Arnold
A road closure and diversion will be in operation while Cadent carries out gas network works.
When: November 30-December 2
Emerys Road, Gedling
The road will be closed at its junction with Stoke Lane for carriageway patching repairs.
When: November 30-December 1
Stoke Lane, Gedling
The road will be closed between Emerys Road and Burton Road for carriageway patching repairs. A diversion will operate via Burton Road.
When: November 30-December 1
Moor Road, Bestwood Village
Two-way temporary traffic lights will be in place while lighting columns are replaced.
When: November 30-December 1
Tuesday, December 1
Hallam Road/Marshall Road, Mapperley
A road closure will be in operation for Severn Trent Water works, with a diversion via Marshall Road.
When: December 1-2
Byron Street, Daybrook
Stop/go boards will be used between numbers 1 and 131 while road markings are refreshed.
When: December 1-2
Sherbrook Road, Arnold
Stop/go boards will be used between numbers 1 and 185 while road markings are refreshed.
When: December 1-2