Arnold NewsCarlton NewsGedling News

Watch out for these roadworks across Gedling borough over the next week

This list contains only the roadworks considered to be most likely to cause delays on key routes as well as those involving road closures and temporary traffic lights.

The list is not exhaustive and does not feature some minor or emergency repairs that come up after publication.

Other roadworks may finish or start before schedule or be cancelled altogether.

All information from Highways England, local authorities and utility companies.

Carlton

Gedling Road

July 10— 12                       

Delays possible due to some carriageway incursion at the junction with St Austin’s Drive as BT install some cables.                               

Gedling Road,

July 11-15

Delays possible due to some carriageway incursion at the junction with Orlando Drive for cabling works.

Marshall Hill Drive

July 15— 17       

Delays possible due to traffic control (give & take) as Severn Trent repair pipes                   

Roadwork_Gedling

Colwick

A612 Road No 1

July 17 — 23 July                             

Delays likely due to traffic control (two-way signals) being put in place as teams try to locate gas main     

A6211,A612 Colwick Loop Road,

July 16                  

Delays likely due to traffic control (two-way signals) on Colwick Loop Road (near Bridge) . This is to allow for repairs to take place for a cable fault                          

Gedling

A6211 Arnold Lane

July 10-12                           

Delays likely due to traffic control (multi-way signals) as work takes place at the junction with Stanhope Road to facilitate telecoms mast swap

A6211 Arnold Lane,

July 16                  

Delays likely Traffic control (multi-way signals)   

Works location: From outside 119, Arnold Lane to allow BT to clear duct blockages in Carriageway, footway to facilitate spine cabling works.                    

A6211 Main Road, Gedling

July 10

Delays likely Traffic control (multi-way signals) as repairs are made to damaged manhole cover   

Featherstone Close

July 16  

Delays possible Traffic control (multi-way signals) at the junction with Featherstone Close for cabling works

Lambley Lane

July 15 — 19 July                             

Delays possible due to traffic control (two-way signals) as Severn Trent carry out work.

Stanhope Road

July 10 — 12 July                             

Delays possible due to traffic control (multi-way signals) at telecoms work takes place at junction with Arnold Road.                                               

Mapperley

B684 Plains Road,

July 12 — 16 July                             

Delays possible due to some carriageway incursion as new meter is put in place by Severn Trent Water   

B684 Plains Road

July 15 — 19 July                             

Delays likely due to lane closure at the junction of Bailey Drive/B684 Plains Road for electrical work.                        

Bailey Drive

July 15 — 19      Delays likely due to road closure as work take

Tags

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Back to top button
Close
Close